Describe about the Project Management For the Internal Development.
Answer:
Introduction
Project management is one of the most important and critical process of any business while considering a specific task. ABC Company has planned to have new construction into their organisation to extend their work place within the premises. The expansion has been done on every sector of the business it is external developing, internal development, sales office extension and others. The current report is based on evaluating various aspect associated with only the construction part of the current project. Analysis of critical path and project baseline derivation involved with the project is also has been discussed throughout the study.
Project Overview
The whole project is estimated for 1730 days long out of that construction part have taken the most of the time. The whole construction for the project has taken approximately 1656 days. This construction part has segmented into few forms, which are external development and podium works. The external development part is also sub divided into two different parts one is pilling and the other one is tie beam & rock anchoring. On the other side podium works is comparatively a longer activity that is also involved with several sub tasks. Excavation and backfilling after that project have constructed PCC and soling. Apart from the activities anti-termite treatment, RCC work, Retaining wall and Col & slab are some other activities that are involved with the main construction process. The main process of construction has started from Q3 of 2013 and it has been completed in Q4 during the year 2014. During the period of construction, some other factors including with the project are pilling and tie beam that comes under external development. Under the construction of excavation and backfilling, building muhurat is another important aspect. During the RCC work soling and PCC is some important criteria. However, during the building of retaining wall and slab both the activity will be done according to three segments, which are ground floor level, B1 level and B2, level. The lat activity is Col & Slab that has been estimated to take about 183.1 days.
Critical Path Evaluation
Critical path is nothing but a project schedule, which have less potential errors. The current project has taken a time frame of 1730 days which is approximately four and a half years. A project operating for more than two years are considered as long-term project (Neos-guide.org, 2017). While looking after the project layout it has been observed that pilling requires 5SS and 32 days on the other side rock anchoring require 14FF and 15 days. As per critical path model, to complete shore piling and excavation executors required to complete the 5SS and 14FF sector first, that leads to project delay. If a project need to go through CPM model then expected delivery of the project will be longer (Kelly et al. 2014, p.12). However, as the current project is a long-term project therefore critical path of the project is comparatively complex and results are uncertain. As per the current project, first element of critical path method is pilling after that excavation. After completing the excavation part PCC and Vertical rock anchoring comes to the picture. After building vertical rock, anchoring RCC for footing and raft is the next element. The last two elements of critical path are col & slab and retaining wall. Hence, it can be said that the critical path here is of about 447 days.
Baseline Derivations
Conducting the whole project require some type of resources. As opined by Sherekar et al. (2016, p. 6771), the resources required for a project can be categorised into two different factors one is material and the other one is time. During the process of implementing project, it can be noticed that, whole construction process required 1656 days. Estimation of the project deadline is primarily depends on baseline of a project. In case if a project manager fail to give a proper structure on the baseline of a project then actual estimation will not be fulfilled by the project. As cited by Mok et al. (2015, p. 447), estimation of a project can be improved by restructuring the baseline of a project. Monitoring performance of a project is one of the most important tasks for project managers. In that context, if baseline plan of a project have not been executed properly then performance of that project have been deteriorated. Taylan et al. (2014, p.111) discussed that, project manager set an estimated project outcome moreover they compare those project outcomes with the actual project. If actual outcomes rate is closer to the estimated value then it is known as better-earned value however if the actual outcomes are lesser than the estimated value then it is considered as less earned value generated by the managers (Svejvig and Andersen, 2015, p. 284).
While looking at the baseline, some negative deviation can be assumed throughout the project. The first one is project delivery estimation, in that context project management team assume that project will be working as per the predetermined schedule. However, some uncertain situations are always part of a well-structured project schedule therefore; it is assumed that delivering a project as per the pre announced date is always not possible. In current project’s timeline, it can be noticed that during the work of excavation, thirty days delay has been occurred moreover during building of RCC work and retaining work, another thirty-seven and 70 days delay has occurred respectively. Another assumption relating to negative deviation is amount of resources required for a project. According to Serra and Kunc (2015, p.61), various cases have been noticed that while executing a project management go through resource shortage. However, the project plan is finalised after consulting with a good project consulting firm still these issues are some common issues, therefore presence of adequate resources is another major negative deviation assumed in that project.
Control Measures (Recommendation)
The project of construction by ABC Company could have been gone through some type of issues, which can have negative impact during the project execution project. The list of recommendation for further improvisation of the project is presented in the following part.
ABC Company should have taken consultation from project consultancy firms before executing the main project.
In various cases in has been observed that, project is have not went as per the plan. Some schedule delays has been occurred during the project execution. Therefore, project planner of ABC Company should have gone through various aspects like material delivery, procurement of goods and others.
Quality management is another issue faced by the ABC Company during the project execution process. Quality management should have taken care by quality management team in order to provide better qualities to each segment of the project.
Conclusion
The report has evaluated various aspect of the office extension project by ABC Company. While looking at the period it has been observed that the project was a long-term project and took around four and a half years to complete it entirely. Out of so many segments, construction part of the project has taken most of the time. The study has observed that as the project is quite lengthy therefore CPM method used by the project management team has leaded to more complexity. While evaluating project baseline derivation it has been noticed that performance assessment and earn value are the most important elements while developing baseline of a project. A list of recommendations to improve the project management have been presented and well explained throughout the report.
References
Books
Kelly, J., Male, S., and Graham, D. (2014). Value management of construction projects. New Jersey, US: John Wiley & Sons.
Journal
Mok, K. Y., Shen, G. Q., and Yang, J. (2015). Stakeholder management studies in mega construction projects: A review and future directions. International Journal of Project Management, 33(2), pp. 446-457.
Sherekar, V., Tatikonda, M., and Student, M. (2016). Impact of factor affecting on labour productivity in construction projects by AHP method. Int. J. Eng. Sci. Comput, 6(6). pp. 6771-6775.
Svejvig, P., and Andersen, P. (2015). Rethinking project management: A structured literature review with a critical look at the brave new world. International Journal of Project Management, 33(2), pp. 278-290.
Taylan, O., Bafail, A. O., Abdulaal, R. M., and Kabli, M. R. (2014). Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies. Applied Soft Computing, 17,pp. 105-116.
Online articles
Serra, C. E. M., and Kunc, M. (2015). Benefits realisation management and its influence on project success and on the execution of business strategies. International Journal of Project Management, 33(1), pp. 53-66. Available at: sciencedirect.com/science/article/pii/S0263786314000519 [Accessed on 21st October 2018]
Website
Neos-guide.org (2017). Project scheduling. Available at: https://neos-guide.org/content/project-scheduling-critical-path-method [Accessed on 21st October 2018]
Free Membership to World’s Largest Sample Bank
To View this & another 50000+ free samples. Please put
your valid email id.
Yes, alert me for offers and important updates
Submit
Download Sample Now
Earn back the money you have spent on the downloaded sample by uploading a unique assignment/study material/research material you have. After we assess the authenticity of the uploaded content, you will get 100% money back in your wallet within 7 days.
UploadUnique Document
DocumentUnder Evaluation
Get Moneyinto Your Wallet
Total 6 pages
PAY 4 USD TO DOWNLOAD
*The content must not be available online or in our existing Database to qualify as
unique.
Cite This Work
To export a reference to this article please select a referencing stye below:
APA
MLA
Harvard
OSCOLA
Vancouver
My Assignment Help. (2021). Project Management. Retrieved from https://myassignmenthelp.com/free-samples/inft3100-project-management/material-delivery.html.
“Project Management.” My Assignment Help, 2021, https://myassignmenthelp.com/free-samples/inft3100-project-management/material-delivery.html.
My Assignment Help (2021) Project Management [Online]. Available from: https://myassignmenthelp.com/free-samples/inft3100-project-management/material-delivery.html[Accessed 18 December 2021].
My Assignment Help. ‘Project Management’ (My Assignment Help, 2021)
My Assignment Help. Project Management [Internet]. My Assignment Help. 2021 [cited 18 December 2021]. Available from: https://myassignmenthelp.com/free-samples/inft3100-project-management/material-delivery.html.
×
.close{position: absolute;right: 5px;z-index: 999;opacity: 1;color: #ff8b00;}
×
Thank you for your interest
The respective sample has been mail to your register email id
×
CONGRATS!
$20 Credited
successfully in your wallet.
* $5 to be used on order value more than $50. Valid for
only 1
month.
Account created successfully!
We have sent login details on your registered email.
User:
Password:
Are you unable to crack the code? Get quality assistance at MyAssignmenthelp.com to secure high grades in programming assignments. Our qualified experts provide programming help in Python, C, C++, Java etc. Java help and other object-oriented programming issues are solved by our experts at the best possible price. If you are in need of proofreading to check for the accuracy of the codes, you just need to place your order on our site. Our experts also help prepare computer lab reports by writing out the entire program with the outputs.
Latest Management Samples
div#loaddata .card img {max-width: 100%;
}
MPM755 Building Success In Commerce
Download :
0 | Pages :
9
Course Code: MPM755
University: Deakin University
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answers:
Introduction
The process of developing a successful business entity requires a multidimensional analysis of several factors that relate to the internal and external environment in commerce. The areas covered in this current unit are essential in transforming the business perspective regarding the key commerce factors such as ethics, technology, culture, entrepreneurship, leadership, culture, and globalization (Nzelibe, 1996; Barza, 2…
Read
More
SNM660 Evidence Based Practice
Download :
0 | Pages :
8
Course Code: SNM660
University: The University Of Sheffield
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: United Kingdom
Answers:
Critical reflection on the objective, design, methodology and outcome of the research undertaken Assessment-I
Smoking and tobacco addiction is one of the few among the most basic general restorative issues, particularly to developed nations such as the UK. It has been represented that among all risk segments smoking is the fourth driving purpose behind infections and other several ailments like asthma, breathing and problems in the l…
Read
More
Tags:
Australia Maidstone Management Business management with marketing University of New South Wales Masters in Business Administration
BSBHRM513 Manage Workforce Planning
Download :
0 | Pages :
20
Course Code: BSBHRM513
University: Tafe NSW
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answer:
Task 1
1.0 Data on staff turnover and demographics
That includes the staffing information of JKL industries for the fiscal year of 2014-15, it can be said that the company is having problems related to employee turnover. For the role of Senior Manager in Sydney, the organization needs 4 managers; however, one manager is exiting. It will make one empty position which might hurt the decision making process. On the other hand, In Brisba…
Read
More
MKT2031 Issues In Small Business And Entrepreneurship
Download :
0 | Pages :
5
Course Code: MKT2031
University: University Of Northampton
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: United Kingdom
Answer:
Entrepreneurial ventures
Entrepreneurship is the capacity and willingness to develop, manage, and put in order operations of any business venture with an intention to make profits despite the risks that may be involved in such venture. Small and large businesses have a vital role to play in the overall performance of the economy. It is, therefore, necessary to consider the difference between entrepreneurial ventures, individual, and c…
Read
More
Tags:
Turkey Istanbul Management University of Employee Masters in Business Administration
MN506 System Management
Download :
0 | Pages :
7
Course Code: MN506
University: Melbourne Institute Of Technology
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answer:
Introduction
An operating system (OS) is defined as a system software that is installed in the systems for the management of the hardware along with the other software resources. Every computer system and mobile device requires an operating system for functioning and execution of operations. There is a great use of mobile devices such as tablets and Smartphones that has increased. One of the widely used and implemented operating syste…