Introduction
RALS or Riverina Agriculture and Lifestyle Show were founded in the year 2000 by the BT and Sons farming Equipments. The show was organized in the month of November every year and it demonstrated the local business of the farmers, agricultural equipments and the lifestyle products manufactured by other companies. Coordination of the volunteers and media was required by the organization to demonstrate their live show. For the coordination they involved BT and sons, and later on Globex became a partner of the RALS because they have a strong engagement I the community and can manage the volunteers effectively. The management of the volunteers and the other activities like managing the donation and keeping records of the tickets were done manually and thus more time was required for the management of the whole process.
The report is prepared on the basis of implementation of rostering system on the RALS business process. The rostering process should be able to handle most of the operations of the volunteers like selling tickets, managing the donations, etc. which would reduce the number of volunteers and decease the time (Walker, 2015). For building the rostering system it is necessary to have a proper analysis on the current process and a scope management plan is built that includes the resources and the technology used for the project (Fitzsimmons & Fitzsimmons, 2013). A project schedule is also made to estimate the time required for the completion of the project. Finally a risk assessment and quality management plan is included in the report that states the various risk associated with the project and the quality of the system developed.
Measurable Organizational values
The main goal of the report is to have a proper analysis on the system requirement and resources available for the development of the rostering system for RALS. For the management of the project the MOV process is applied and this process covers the project in six steps such as:
Identification of areas of impact
Identification of the cost of the project
Development of the appropriate metric
Estimating the time to complete the project (Kerzner, 2013)
Verification and getting agreement from the stakeholders involved in the project.
Summarizing the values in a statement
For the development of the rostering system analysis of the information about the volunteers such as their name and address, roles, works for which organization, assigned task, etc. There is a need to give the project on time and the areas of impact of the project and are discussed in the following table
Rank
Areas of impact
Value
Metric
Time required
1
Customer
It increases the availability of the volunteers and thus providing better service to the customers
It reduces the work of the volunteers and the management to keep records of the volunteers (Leach, 2014).
3 months
2
Strategy
To acquire a greater percentage of share in the market providing a quality service to its customers.
To increase the share value by 15 percent
2 months
3
Financial
The organization saves money by investing on the agricultural investments and meeting all the requirements of the client.
The expense is cut down to 30%
4
Operation
The organizational values are measured and the cost of operation for the business expansion is decreased (De Waal, 2013).
The response time must be less and the customer should be highly satisfied using the service.
6 months
5
Social
The communication between the client and the system should be efficient and all the information of the volunteers should be captured.
It reduces the waiting time of the customer.
3 months
A better and faster rostering system can be obtained implementing the MOV in for the development of the automated system (Succar, Sher & Williams, 2013). The quality of information gained from the system is improved and the roles and the assigned task of the volunteers can be managed efficiently. The errors in the system would be reduced and it would take less time than the manual process (Schwalbe, 2015). With the implementation of the automated RALS information system it can gain ore profit and reduce the manpower for managing the system.
Scope Management Plan
Project Scope
The personal information gathered for the RALS information system must be secured from any unauthorized access. The data sharing between the management and the administration should be limited and an encryption technique may be applied (Lin & Tain-Dow, 2015). The manual system is replaced applying the web-based system and thus the time taken to complete the business process is reduced. The project should involve all the processes and the role of the volunteer and the portal must be accessible to the client and the volunteer. The data base should be handled by the DBA (Database administrator) and he should update the database frequently to provide up to date details to the client (Burke, 2013). The system should be flexible to adopt any change in their requirement of the client and all the requirements of the client should be met. The requirements can be understood clearly by involving the stakeholders in the various stage of development.
Roles and responsibilities of the developers involved in the project.
Roles
Responsibility
Project Sponsor
The sponsor is responsible for the collection of resources and money for the development of the project
Project Manager
The manager plans the project and divides the project into different parts like requirement analysis, planning, executing, design and project closure (Shahnazari, Pourzolfaghar & Mirza, 2013).
Project Scheduler
The scheduler divided the different parts of the development into time limits or the time it would take to complete the work.
Risk management
The risk manager finds the risk associated with the project and finds the ways to mitigate the risk (Woolliscroft et al., 2013)
Designer
The system designer analyses the requirement of the client and design the interface to meet the requirement (Haimes, 2015).
Analyst
The system analyst analyses the resource available for the development of the project
Business consultant
They give proper suggestion for the improvement of the project and finds the flaws in the system
Financial Manager
He is responsible for estimating and managing the budget of the project.
Technology applied
There are many tools and technology that can be applied for the development of the project. Mid-map, UML techniques, database model tools, programming languages and different libraries and frameworks can be applied for the development of the project. The development of the project requires resources like desktops or laptops with high end configuration and internet connection for accessing different sources (Woolliscroft et al., 2013). Different networking protocol and database security techniques can also be applied for building the system. A PERT chart and a Gnatt chart can also be applied to estimate the cost and time required for the completion of the project.
Training and facilities
The volunteers should be trained regarding the usage of the information system and upload of the necessary data. The volunteer information are entered into the system up to February 2017 and thus the employees and the stakeholders associated with the system would lack in information and thus it is necessary to provide them training for the proper utilization of the system.
Project Schedule and WBS
Project schedule
Task Mode
Task Name
Duration
Start
Finish
Predecessors
Resource Names
Auto Scheduled
Riverina Rostering system development
180 days
Thu 9/22/16
Wed 5/31/17
Auto Scheduled
Initialization phase
29 days
Thu 9/22/16
Tue 11/1/16
Auto Scheduled
Developing the SRS document
10 days
Thu 9/22/16
Wed 10/5/16
Executive sponsor, Requirement analyst
Auto Scheduled
Feasibility study of the existing system
7 days
Thu 10/6/16
Fri 10/14/16
3
project manager, Requirement analyst
Auto Scheduled
Identification of the requirements of the desired system
5 days
Mon 10/17/16
Fri 10/21/16
3,4
Requirement analyst
Auto Scheduled
Utilization of the project specifications
7 days
Mon 10/24/16
Tue 11/1/16
3,5
Developer, Requirement analyst
Auto Scheduled
Meeting with the management team and visitors of show
5 days
Mon 10/24/16
Fri 10/28/16
4,5
Accountant, Executive sponsor, project manager
Auto Scheduled
Appointing of development vendor
21 days
Mon 10/31/16
Mon 11/28/16
Auto Scheduled
Identification of the developement vendor
5 days
Mon 10/31/16
Fri 11/4/16
5,7
Accountant, project manager
Auto Scheduled
Analyzing the vendor capability and background
10 days
Mon 10/31/16
Fri 11/11/16
7
Accountant, Executive sponsor, project manager
Auto Scheduled
Planning of total time taken to complete
7 days
Mon 11/14/16
Tue 11/22/16
9,10
Executive sponsor, project manager
Auto Scheduled
Budget planning
4 days
Wed 11/23/16
Mon 11/28/16
11,10
Accountant
Auto Scheduled
Design Phase
38 days
Mon 11/14/16
Wed 1/4/17
Auto Scheduled
Improving the labour management
10 days
Mon 11/14/16
Fri 11/25/16
10
Accountant, Executive sponsor
Auto Scheduled
Start to build the system
18 days
Mon 11/28/16
Wed 12/21/16
14
Developer, project manager
Auto Scheduled
Improvement of installation process
5 days
Thu 12/22/16
Wed 12/28/16
11,15
Developer
Auto Scheduled
Understanding the system requirements for next built
5 days
Thu 12/29/16
Wed 1/4/17
16
Developer, project manager
Auto Scheduled
Milestone: Completion of design phase
0 days
Thu 9/22/16
Thu 9/22/16
Auto Scheduled
Implementation phase of the system at organization
32 days
Thu 1/5/17
Fri 2/17/17
Auto Scheduled
Start implementation according to business objectives
10 days
Thu 1/5/17
Wed 1/18/17
17,18
Developer, project manager
Auto Scheduled
Modification in the first built of the system
5 days
Thu 1/19/17
Wed 1/25/17
20
Developer, Requirement analyst
Auto Scheduled
Collection of resources and equipments for the project
12 days
Thu 1/26/17
Fri 2/10/17
21
Accountant, project manager
Auto Scheduled
Verification of the equipments and resources
5 days
Mon 2/13/17
Fri 2/17/17
22
Developer, project manager
Auto Scheduled
Testing phase
25 days
Mon 2/20/17
Fri 3/24/17
Auto Scheduled
test run of the system
7 days
Mon 2/20/17
Tue 2/28/17
22,23
Executive sponsor, project manager
Auto Scheduled
Carrying out the test plan
8 days
Wed 3/1/17
Fri 3/10/17
23,25
Software tester
Auto Scheduled
Analyzing the test result in real scenario
8 days
Mon 3/13/17
Wed 3/22/17
25,26
Risk manager, Software tester
Auto Scheduled
Presentation of the result
2 days
Thu 3/23/17
Fri 3/24/17
25,27
project manager, Software tester
Auto Scheduled
Milestone: acceptance of the test results by client
0 days
Thu 9/22/16
Thu 9/22/16
Auto Scheduled
Risk management phase
24 days
Mon 3/27/17
Thu 4/27/17
Auto Scheduled
Identification of the possible risks
7 days
Mon 3/27/17
Tue 4/4/17
28,29
Risk manager, Software tester
Auto Scheduled
presentation of the risks to the risk manager
2 days
Wed 4/5/17
Thu 4/6/17
31
project manager, Risk manager
Auto Scheduled
mitigation of the risks
7 days
Wed 4/5/17
Thu 4/13/17
31
Developer, Risk manager
Auto Scheduled
Registering the impacts of the risks
5 days
Fri 4/14/17
Thu 4/20/17
31,33
project manager, Risk manager
Auto Scheduled
Identify the impacts of the risks
15 days
Fri 4/7/17
Thu 4/27/17
32
project manager, Risk manager
Auto Scheduled
Milestone: Acceptance of the risk document by the client
0 days
Thu 9/22/16
Thu 9/22/16
Auto Scheduled
Closure of the project
24 days
Fri 4/28/17
Wed 5/31/17
Auto Scheduled
Evaluation of the functionality of the developed system
9 days
Fri 4/28/17
Wed 5/10/17
35
Executive sponsor, project manager
Auto Scheduled
Rolling out the finally developed project
15 days
Thu 5/11/17
Wed 5/31/17
38
Developer, project manager
Auto Scheduled
Milestone: Installation of the final system to the organization
0 days
Wed 5/31/17
Wed 5/31/17
39
WBS
Project risk and planning
Assumptions
It is accepted that the project finishes inside the evaluated time and in addition the estimated spending plan. It is likewise expected that the task is directed by tailing every one of the tenets and controls of the association. All the task colleagues ought to take after the rules so it will morally finish the venture arrangement without impacting anybody (Bavota et al, 2012). It is likewise accepted that the endorsement from the task supervisor will go inside few days in the wake of presenting the configuration of RALS rostering framework.
Identification of Risk
Risks
Member associated with the risk
Details
Mitigation technique
Technical risk
System Analyst
The network or the server may not work properly and this may cause the system to become down.
The servers and the networks should be monitored regularly and there is a need to run maintenance at a regular internal of time (Schwalbe, 2015).
Financial risk
Financial Manager
There may be extra expense and this may cause shortage in the budget plan.
A proper budget plan is required to be made with some extra money kept for emergency conditions.
Lack of resource
Project Manager
If the estimation is not calculated properly or the requirement is not understand it may delay the project progress (Burke, 2013).
A proper analysis is required to be done and using of cost estimation tool can help to mitigate this issue.
Loss of manpower
Project Manager
If any team member becomes ill or has less skill to manage the work it increases the pressure on the skilled workers and the manpower is lossed (Kerzner, 2013).
To release the work pressure some extra team members must be reserved.
Risk in privacy
Project Manger
The collected information about the volunteers should be kept securely during the development process as it may cause intruder to misuse their information (Walker, 2015).
The digital signature and the information of the volunteers should be kept securely with some added protection.
Quality management Plan
Project Name: RALS rotering project
Project Manager Name
Type
Reason
Time taken
Owner
Method
Status
Expense Authorization
The expense for the development of the project must be done from a single person and it reduces the chance of misuse.
2 month
Financial Manager
Managing of the expense
Open
Documentation of the project
The status of the project must be documented daily
1 month
Project manager
Monitoring of the progress of the project
Closed
Work break down structure
It makes easy to identify the task assigned.
3 month
Project Manager
Inspection of the work of the development team
Open
Project plan
A proper analysis is done on the requirement of the client.
1 month
Project Manager
Review of the project that if it is developing based on the planning
Closed
Risk plan
Review of the risk arising during the development of the project
4 months
Risk manager
Review of the framework
Open
MOV
It identifies the stakeholders associated with the project
2 month
Project manager
monitoring
Closed
Training material
Training manual is provided to the team members to increase their efficiency.
3 month
Project manager
Presentation and journals
Open
Conclusion
The report concludes that the Riverina Agriculture and Lifestyle show activities to make a management system for removing their manual process and dependency on the volunteers. The current business process is automated and RALS outsource for the development of their process. The new information system would take nearly 6 month for its completion and the system would be capable of managing the volunteer information and provide effective service to the customers. It would also reduce the pressure from the staffs gather information about the different volunteers and agencies involved in the process it is necessary to develop the rostering system. The report discusses about the development of the project and the involvement of the team members for conducting the project development.
References
Bavota, G., De Lucia, A., Fasano, F., Oliveto, R., & Zottoli, C. (2012, June). Teaching software engineering and software project management: An integrated and practical approach. In Proceedings of the 34th International Conference on Software Engineering (pp. 1155-1164). IEEE Press.
Burke, R. (2013). Project management: planning and control techniques.New Jersey, USA.
De Waal, A. (2013). Strategic Performance Management: A managerial and behavioral approach. Palgrave Macmillan.
Fitzsimmons, J., & Fitzsimmons, M. (2013). Service management: Operations, strategy, information technology. McGraw-Hill Higher Education.
Haimes, Y. Y. (2015). Risk modeling, assessment, and management. John Wiley & Sons.
Kerzner, H. R. (2013). Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons.
Leach, L. P. (2014). Critical chain project management. Artech House.
Lin, L. M., & Tain-Dow, L. E. E. (2015). Symbolic Economy and Creative Management: Cultural and Creative Industries Urging for New Approaches.Journal of Cultural Management and Policy, 57.
McNeil, A. J., Frey, R., & Embrechts, P. (2015). Quantitative risk management: Concepts, techniques and tools. Princeton university press.
Schwalbe, K. (2015). Information technology project management. Cengage Learning.
Shahnazari, M., Pourzolfaghar, Z., & Mirza, M. N. (2013, January). A Review of Project Managerial Aspects Influenced by Emotional Intelligence. InECMLG2013-Proceedings For the 9th European Conference on Management Leadership and Governance: ECMLG 2013 (p. 475). Academic Conferences Limited.
Succar, B., Sher, W., & Williams, A. (2013). An integrated approach to BIM competency assessment, acquisition and application. Automation in Construction, 35, 174-189.
Walker, A. (2015). Project management in construction. John Wiley & Sons.
Woolliscroft, P., Relich, M., Caganova, D., Cambal, M., Sujanova, J., & Makraiova, J. (2013, October). The implications of tacit knowledge utilisation within project management risk assessment. In International Conference on Intellectual Capital and Knowledge Management and Organisational Learning(p. 645). Academic Conferences International Limited.
Free Membership to World’s Largest Sample Bank
To View this & another 50000+ free samples. Please put
your valid email id.
Yes, alert me for offers and important updates
Submit
Download Sample Now
Earn back the money you have spent on the downloaded sample by uploading a unique assignment/study material/research material you have. After we assess the authenticity of the uploaded content, you will get 100% money back in your wallet within 7 days.
UploadUnique Document
DocumentUnder Evaluation
Get Moneyinto Your Wallet
Total 12 pages
PAY 7 USD TO DOWNLOAD
*The content must not be available online or in our existing Database to qualify as
unique.
Cite This Work
To export a reference to this article please select a referencing stye below:
APA
MLA
Harvard
OSCOLA
Vancouver
My Assignment Help. (2017). Project Management On RALS Rostering Project. Retrieved from https://myassignmenthelp.com/free-samples/project-management-on-rals-rostering-project.
“Project Management On RALS Rostering Project.” My Assignment Help, 2017, https://myassignmenthelp.com/free-samples/project-management-on-rals-rostering-project.
My Assignment Help (2017) Project Management On RALS Rostering Project [Online]. Available from: https://myassignmenthelp.com/free-samples/project-management-on-rals-rostering-project[Accessed 19 December 2021].
My Assignment Help. ‘Project Management On RALS Rostering Project’ (My Assignment Help, 2017)
My Assignment Help. Project Management On RALS Rostering Project [Internet]. My Assignment Help. 2017 [cited 19 December 2021]. Available from: https://myassignmenthelp.com/free-samples/project-management-on-rals-rostering-project.
×
.close{position: absolute;right: 5px;z-index: 999;opacity: 1;color: #ff8b00;}
×
Thank you for your interest
The respective sample has been mail to your register email id
×
CONGRATS!
$20 Credited
successfully in your wallet.
* $5 to be used on order value more than $50. Valid for
only 1
month.
Account created successfully!
We have sent login details on your registered email.
User:
Password:
MyAssignmenthelp.com delivers assignment help to millions of students of USA. We have in-house teams of assignment writers who are experts on wide ranges of subjects. We have appointed teams of native writers who provide assignment help to students in New York City and all over the USA. They are skilled assignment writers who successfully cater to search terms like do my assignment in the USA
Latest Project Management Samples
div#loaddata .card img {max-width: 100%;
}
SBM 1201 Project Scope, Time And Cost Management
Download :
0 | Pages :
12
Course Code: SBM1201
University: Asia Pacific International College
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answer:
Introduction
This project plan deals with the development of a fuel-efficient HHO Generator. The HHO fuel cells may appear to provide high fuel efficiency to the users. Nevertheless, there are a few confinements and focuses to be seen, as given beneath. This is to clear up that there is NO 100% substitution of petroleum derivative by including HHO cell. HHO gas is otherwise called Brown Gas, yet this is to illuminate that HHO gas is n…
Read
More
Tags:
Australia Footscray Management organisational behviour University of New South Wales Masters in Business Administration
HS2061 Information Systems Project Management
Download :
0 | Pages :
9
Course Code: HS2061
University: Holmes Institute
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answer:
Case Overview:
The project owner of the Signed, sealed, delivered courier service is facing the problems of managing order of couriers in the synchronised manner. The project manager is incapable of managing central warehouse for the dispatching of products. The important information can be lost with the passage of time. The inventory management of the warehouse is the major concern for the owner of the company. He is looking forward …
Read
More
OPS 935 Project Management
Download :
0 | Pages :
11
Course Code: OPS935
University: University Of Wollongong
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answer:
Introduction
This essay explores the impacts of digital technologies on project management. It explores how adoption of digital technologies by companies for managing their project have affected their, project managers, human resource, business processes, timelines, deliverables, and practices of risk management, people management and quality management.
Impact of Digital technologies on Project Management Practices
Digital te…
Read
More
Tags:
Australia Saint Kilda Management International Management University of New South Wales Masters in Business Administration
ITC505 ICT Project Management
Download :
0 | Pages :
10
Course Code: ITC505
University: Charles Sturt University
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answers
Case Study- Social Media Research Center
Task-1: Project Charter
Project Objectives
The main objective of the project is to develop a web-based system within the organization “Social Media research Center”. It is analyzed that the Social Media research center wants to develop the web based system in order to connect people with the organization for promoting its research center. The web-based system that is developed conta…
Read
More
Tags:
Australia Alfredton Management IT Network Security University of New South Wales Masters in Business Administration
ITC505 ICT Project Management
Download :
0 | Pages :
7
Course Code: ITC505
University: Charles Sturt University
MyAssignmentHelp.com is not sponsored or endorsed by this college or university
Country: Australia
Answers
Part One- Project Name / Team / Description
Project Name:
RALS Solution
Team Name:
Consultants for RALS
Project Description:
RALS organizes show for the farmers and other related small business persons to display their latest technology equipment for betterment in the field of agriculture and crop production. The show has different types of stalls and other facilities for which many volunteers …
Read
More
Next